Construction Quotes in Belgium: All Mandatory Details (2026)
Complete guide to mandatory details on a Belgian works quote: company number, VAT number, payment terms, validity, and risks in case of error.
Construction Quotes in Belgium: All the Mandatory Details (2026)
A quote for building work in Belgium is not just a commercial document — it is an act that legally binds you. A poorly drafted quote can cost you a contract, a client relationship or an administrative fine. Here is exactly what it must contain.
Why the mandatory details matter
In Belgium, the rules on commercial practices impose strict information obligations on professionals who deal with consumers. An incomplete or misleading quote can:
- Call into question the validity of the contract
- Expose the contractor to administrative penalties
- Give the customer legal grounds to refuse payment
- Lead to disputes that are hard to defend in court
The good news: If your quote contains all the required details, you are protected.
The mandatory details on every Belgian quote
1. Full identification of your business
On every quote, you must state:
BCE number (Crossroads Bank for Enterprises) Your 10-digit company number (format BE + 10 digits). It is your unique identifier in Belgium — mandatory on all your commercial documents since 2003.
VAT number If you are liable for VAT (which is the case as soon as you exceed €25,000 in annual turnover), your VAT number must appear on the quote. Format: BE + 10 digits (identical to the BCE number for individuals and certain companies).
Legal form and company name Your trading name and, if you operate as a company, the legal form (SPRL, SRL, SA, etc.) and the registered office.
Full contact details Address of the registered office or principal place of business, telephone number and email address.
2. Identification of the customer
- The customer's surname and first name or company name
- The customer's address (different from the site address where applicable)
- The address of the site
3. Quote date and number
Date of issue: Mandatory in order to calculate the period of validity.
Quote number: Not legally required, but strongly recommended for your own organisation and your defence in the event of a dispute. Use sequential numbering (e.g. QUO-2026-001).
4. Detailed description of the work
This is the most important part — and the one most often rushed.
Your description must be precise enough for a third party to understand exactly what is included in the price. Vague wording such as "kitchen renovation work" is not enough.
What the description must contain:
- The exact nature of each work item
- The quantities (linear metres, square metres, units)
- The materials used, with brand/quality where relevant
- What is included and what is explicitly excluded
- The site access conditions where these matter
5. Price excluding VAT and the applicable VAT rate
The price must be presented:
- Per item (recommended) or as a global lump sum
- Excluding VAT (excl. VAT) and inclusive of all taxes (incl. VAT)
- With the applicable VAT rate for each item (6% or 21%)
If you apply the 6% VAT rate, stating the legal basis is recommended (art. 1 of Table A of the annex to Royal Decree No. 20 of the Belgian VAT Code).
6. Period of validity of the quote
Legally, a quote with no validity date may be regarded as valid indefinitely — which can expose you if material prices have risen. Always state an explicit period of validity.
Recommended practice: 30 days for small jobs, 60 to 90 days for large projects.
7. Payment terms
You must state your payment terms, in particular:
- The payment period (e.g. 30 days after invoicing)
- Any deposit required (amount and date)
- The terms for interim payments (progress payments)
Late-payment penalties: Under Belgian law (Law of 2 August 2002), you may provide for late-payment interest. If nothing is stated, the statutory rate applies automatically. It is advisable to state it explicitly to avoid any ambiguity.
8. Completion time
Even if only approximate, the completion time must be stated. Specify whether it refers to working days or calendar days, and whether the time is conditional on the availability of materials or on other factors.
9. Signature and acceptance
For a quote to have contractual value, it must be accepted by the customer. On your document, provide space for:
- The date of acceptance
- The customer's signature
- The wording "Agreed" or "Read and approved"
Electronic signature: In Belgium, an electronic signature has had the same legal value as a handwritten one since the eIDAS Regulation (2016). A signature made through a digital tool such as BatiOffice is therefore fully valid.
The specific details depending on your situation
If you work with private consumers (B2C)
In B2C, additional obligations apply under the Code of Economic Law:
- Right of withdrawal: For work ordered at the customer's home or off business premises, the customer has 14 calendar days to withdraw. This information must appear on your offer or contract.
- Legal warranty: State the 2-year legal warranty for hidden defects and, where applicable, the ten-year liability.
- Contractor accreditation: Certain work requires regional accreditation (COCOF, WALLBUILD, etc.). State your accreditation number if you have one.
If you fall under the reverse-charge (co-contractor) scheme
If your customer is itself a VAT taxable person (another contractor or company) and you are working B2B on immovable property, the co-contractor scheme may apply. In that case, the VAT is reverse-charged to the customer — state this explicitly on the quote.
The most common mistakes
1. Forgetting the BCE number This is the most common mistake. Without a BCE number, your quote does not comply with Belgian law.
2. Not stating the exclusions "Painting not included" or "sanitary fittings supplied by the customer" must appear explicitly to avoid disputes.
3. A VAT-inclusive price with no VAT breakdown Stating a single VAT-inclusive price without breaking down the net amount and the VAT rate is not enough. In the event of a VAT audit, the authorities can issue an adjustment.
4. No period of validity You run the risk of having to honour a quote at last year's prices.
5. A description that is too vague "Complete renovation of the bathroom" with no breakdown of items can be challenged by the customer if the result does not match their expectations.
A compliant quote is also your best sales tool
A professional, complete quote reassures your customer. It shows that you are serious, organised and that you know the regulations. In a sector where consumer distrust runs high, a well-presented document makes all the difference.
At BatiOffice, all these details are generated automatically on every quote. You fill in the work items, and we take care of the legal details, the VAT calculation and the layout. Your customer signs electronically, and you receive confirmation instantly.
This guide is provided for information purposes only. For any specific legal question, consult a lawyer or your accountant.