How to Set Contractor Prices in Belgium: Practical 2026 Guide
A complete method for calculating hourly rates and fixed prices as a Belgian construction contractor, including real costs, margins, benchmarks, and common mistakes.
How to Set Your Tradesman Rates in Belgium: A Practical 2026 Guide
Too many Belgian tradesmen set their rates on gut feeling, by looking at what the competition charges or by rounding off their hourly cost. The result: margins that don't reflect real costs, undercharged clients and, sometimes, jobs that cost money instead of making it. This guide gives you the method.
Why so many tradesmen undercharge
The "going rate" trap
"The local plumber charges €55/hr, so I'll do the same." That reasoning ignores one basic fact: you have no idea whether your competitor is actually making a living at that rate. He may be quietly running himself into the ground without realising it.
The hidden costs
When a tradesman charges €55/hr, he's usually thinking about his gross hourly wage. But his real cost is far higher:
- Self-employed social security contributions (18-23% of gross income)
- Professional and ten-year (decennial) liability insurance
- Vehicle(s): purchase, maintenance, fuel, insurance
- Tools: purchase, replacement, maintenance
- Site equipment: PPE, small kit
- Phone, software, accountant
- Non-billable time: quotes, travel, admin, training
Non-billable time: the most underestimated factor
Out of 8 hours on the clock in your day, how many do you actually bill? For most tradesmen, it's between 5 and 6 hours. The remaining 2 to 3 hours go on travel, quotes, client calls and admin.
If you charge €55/hr but only work 5 productive hours out of 8, your effective rate is just €34/hr.
Working out your real cost price
Step 1: Add up your annual overheads
List all your fixed annual costs:
Social and tax charges
- Self-employed social security contributions (roughly €3,600 minimum + around 21% above that)
- Income tax (calculated on your net profit)
- VAT: neutral if you're VAT-registered
Insurance
- Professional liability insurance: €300 to €800/yr depending on the activity
- Ten-year (decennial) liability insurance (structural work): €500 to €2,500/yr
- Commercial vehicle insurance: €600 to €1,500/yr
- Disability/incapacity insurance: €600 to €1,200/yr
Vehicle
- Depreciation (8-year lifespan, average cost €25,000): €3,125/yr
- Fuel and maintenance: €3,000 to €6,000/yr depending on the activity
Tools and equipment
- Depreciation on tools and machines: €1,500 to €4,000/yr
- Replacing consumables: €500 to €1,500/yr
General overheads
- Accountant: €800 to €2,000/yr
- Phone and internet: €600 to €1,200/yr
- Software (quotes, scheduling, etc.): €300 to €1,000/yr
- Training: €200 to €800/yr
Estimated total fixed costs: €12,000 to €22,000/yr for a typical solo tradesman.
Step 2: Work out your billable hours per year
Start from 220 working days (52 weeks × 5 days − statutory leave − public holidays).
Subtract your non-billable time:
- Travel: 30-45 min/day on average
- Quotes and admin follow-up: 1-2 hrs/day
- Buying materials and supplies: 30 min/day
In reality: around 1,100 to 1,300 billable hours per year for an active solo tradesman.
Step 3: Work out your minimum hourly rate
Formula:
Minimum hourly rate = (Fixed costs + Desired earnings) / Billable hours
Example:
- Fixed costs: €18,000/yr
- Desired earnings (net): €36,000/yr (€3,000/month net)
- Billable hours: 1,200 hrs/yr
Minimum hourly rate = (18,000 + 36,000) / 1,200 = €45/hr excl. VAT
This rate is your floor. Below it, you're losing money.
Step 4: Add your margin
The floor rate leaves nothing for the unexpected, for future investment or for growth. Add 20 to 40% depending on how you're positioned:
- Competitive market, standard work: +20% → €54/hr
- Specialist, recognised expertise: +35% → €61/hr
- Emergencies, special call-outs: +50% → €68/hr
Indicative rates by trade in Belgium (2026)
These ranges are based on standard industry practice. Your own rate should be worked out from your own cost structure.
| Trade | Hourly rate excl. VAT | Notes | |---|---|---| | Electrician | €55 - 80 | +50% for emergencies | | Plumber | €55 - 80 | +50% for emergencies | | Roofer | €50 - 75 | Highly seasonal | | Painter | €40 - 65 | Varies with finish | | Tiler | €45 - 70 | Depends on complexity | | Bricklayer | €45 - 70 | | | Joiner | €50 - 80 | Bespoke work at the top end | | Heating engineer | €60 - 90 | Technical expertise commands more | | Home-automation electrician | €70 - 110 | Specialist niche |
Fixed-price quotes vs. hourly rates: when to use which?
The hourly rate
Pros: Simple to explain, suited to unpredictable work, no risk of being underpaid if the job overruns.
Cons: The client doesn't know what they'll end up paying, which creates anxiety and vague requests for estimates. Hard to compare against the competition.
Best for: Repairs, emergencies, quoted work that's hard to estimate (hidden surprises possible), day-rate work.
The fixed-price quote
Pros: The client knows exactly what they're paying. You can charge for your expertise (a job you do in 3 hours is worth your rate, not just 3 hours × hourly rate). Easier to compare and to sell.
Cons: You carry the risk of overruns. If you've estimated badly, you absorb the extra.
Best for: Well-defined renovations, turnkey projects, work whose scope you know inside out.
Our recommendation: Use fixed prices for work you've mastered, with an "if hidden defects are found" clause in your quote. Keep day-rate work for uncertain jobs.
The most common pricing mistakes
1. Not reviewing your rates every year
Inflation, fuel price rises, higher social security contributions — everything goes up. If you haven't reviewed your rate in 2 years, you're probably working for less than you used to. Recommended review: at least once a year, on 1 January.
2. Being embarrassed to state your price
A tradesman who's embarrassed by his rate says it hesitantly and leaves the door open to haggling. A tradesman confident in his worth states his rate clearly and lets the client decide. Serious clients don't choose on price alone — they choose on trust.
3. Giving discounts too easily
Every discount handed out with nothing in return (a longer deadline, a reduced scope) destroys your margin and cheapens your work in the client's eyes. If you have to discount, counter-offer with a smaller scope or an early payment.
4. Not charging for travel
If your client is 45 minutes away, that hour on the road (there and back) needs to be billed or built into your quote. Plenty of tradesmen forget it — that's 2 unpaid hours lost on every distant job.
How to justify your rate to the client
"That's too expensive" — every tradesman hears it. Here's how to respond without dropping your prices:
-
Explain the value, not the cost: "My rate covers the guarantee of Belgian compliance, a detailed quote, coordination with your architect and post-job follow-up."
-
Point to your experience: "I've been doing this kind of work for 10 years — I won't make a mistake that costs you more to put right."
-
Show your professionalism: A clean quote, a complete company profile, Google reviews — all of it justifies charging more than the guy who texts a price.
-
Be willing to lose clients on price: The client hunting for the cheapest option is often the most difficult, the slowest to pay and the quickest to complain. Leave him to your competitor.
A fair rate lets you do your job properly, take pride in your work and build a business that lasts. That's the foundation of everything.