PEB and Energy Renovation in Wallonia: 2026 Contractor Guide
What Walloon construction contractors need to know about PEB, energy renovation obligations, required certifications, and available grants in 2026.
EPB and Energy Renovation in Wallonia: A Guide for Contractors 2026
Energy renovation is the driving force of the construction market in Wallonia. Growing EPB obligations, regional grants, required certifications — building contractors who master this field enjoy a considerable commercial advantage. Here is what you need to know.
Understanding the EPB in Wallonia
What is the EPB?
The EPB (Energy Performance of Buildings) is the European system for assessing the energy efficiency of buildings, transposed into Walloon law. In Wallonia, the legal framework is set by the decree of 28 November 2013 and its implementing orders.
A building is given an EPB rating from A+ to G according to its primary energy consumption (kWh/m².year). The higher the rating, the less the building consumes.
The EPB certificate: what your clients need to know
In Wallonia, an EPC is mandatory:
- On any sale of an existing residential property
- On any rental of a residential property
- For new buildings and major renovations
The certificate is drawn up by an accredited EPB certifier — not by you as the contractor, unless you have obtained the specific training and accreditation.
What you have to do during works
For major renovation works (insulation, replacement of the heating system, replacement of window frames), your client must file an EPB declaration through an accredited EPB supervisor. This EPB supervisor may be the architect, the works manager or an accredited professional.
Your obligations as a contractor:
- Comply with the minimum thermal requirements for the elements you install
- Provide the technical data sheets of the materials installed (Ud, Uw value, λ conductivity)
- Not deviate from the specifications of the technical file without the agreement of the EPB supervisor
Current EPB requirement levels in Wallonia
For renovations (works on existing buildings)
Since January 2024, requirements have tightened in Wallonia. For each element of the building envelope that is replaced or installed, minimum values apply:
Roof insulation:
- R ≥ 4.5 m².K/W (about 15 cm of mineral wool or 12 cm of PUR)
External wall insulation:
- R ≥ 2.0 m².K/W on the outside, or distributed insulation
- R ≥ 1.0 m².K/W on the inside (where external insulation is not possible)
Floor insulation (over a cellar or crawl space):
- R ≥ 2.0 m².K/W
Window frames and glazing:
- Uw ≤ 1.5 W/m².K (for the frames)
- Ug ≤ 1.0 W/m².K (for the glazing)
Heating systems:
- Boiler: minimum efficiency depending on the fuel
- Heat pump: minimum COP depending on the type
- Progressive ban on new oil-fired boilers in Wallonia (since 2025)
Towards deep-renovation obligations
Wallonia's "quality decree" imposes obligations for progressive energy renovation:
- By 2030: All homes put up for rental must reach at least the D label
- By 2035: Minimum C label for rentals
- By 2050: The Walloon residential stock at an A label on average
What this means for you: Tens of thousands of homes will have to be renovated before these deadlines. The energy renovation market is structurally buoyant for the next 25 years.
Useful certifications for a contractor
1. RGE (Reconnu Garant de l'Environnement) — the Walloon equivalent
In Wallonia, for your clients to benefit from the maximum grants (under the regulations in force), you must be recognised as an accredited contractor according to the Region's criteria. This entails:
- Training in insulation and air-tightness techniques
- A minimum number of projects completed in the technique concerned
- A regular audit of your work
Ask the Walloon Construction Confederation (Confédération Construction Wallonie) about recognised training courses.
2. Accredited heat pump (HP) installer
To install heat pumps, a specific certification is often required by manufacturers for the warranties. Training is offered by accredited bodies such as CSTC-WTCB, Techlink, or the IFAPME competence centres.
3. Certified for PV and batteries
For the installation of photovoltaic panels, APERe certification or equivalent is recommended and often required for access to the grants.
The Walloon grants: what your clients can obtain
Understanding regional grants is a powerful sales argument. A client who knows you have mastered the grant procedures trusts you more.
Walloon Energy grants (2026)
The Guichet de l'Énergie (Energy Desk) portal centralises all the support schemes:
Roof/attic insulation:
- Base grant: €15 to €35/m² depending on income and the building's age
- Bonus for very old homes or low incomes
Wall insulation:
- Grant: €12 to €30/m²
Window frame replacement:
- Grant: €10 to €22/m² of glazing
Air/water heat pump:
- Grant: €2,000 to €5,000 depending on capacity and income
Condensing boiler:
- Less generous since 2025; heat pumps take priority
Important note: The amounts change regularly. Always direct your clients to energie.wallonie.be for the up-to-date amounts.
Zero-interest eco-loan
Wallonia offers 0%-interest loans for energy renovation, with no income condition. Ceiling: €60,000 over 10 years.
How to leverage it: "The insulation work I'm proposing will cost you €15,000. With the grants (~€4,000) and the zero-interest eco-loan, your net cost over 10 years is ~€11,000, spread over €91/month with no interest. And your energy bills will drop by 40 to 60%."
Integrating energy renovation into your commercial offer
Position yourself as the local expert
Add pages to your website dedicated to each type of energy work:
- "Roof insulation in [town] — grant included"
- "Double-glazing window replacement [town]"
- "Heat pump installation [province]"
These targeted pages capture local searches with a high purchase intent.
Offer a simplified energy assessment
During your site visit, systematically identify the property's energy priorities. A client who came back to redo their bathroom may decide to add roof insulation if you explain the available grants.
Master the return-on-investment calculations
Your client wants to know how long it will take to recoup the investment. With tools such as the CSTC-WTCB calculators, you can give them an estimate of the expected annual saving.
What changes with the shift to low-carbon heating
Wallonia is progressively banning new oil-fired heating installations (in force since 2025). By 2035, gas boilers will no longer be allowed in new builds.
For heating and plumbing contractors:
- Training in heat pumps is a profitable short-term investment
- Demand for heat pump installation has tripled in 3 years in Wallonia
- Clients are looking for competent contractors — supply is not yet keeping up with demand
For insulation contractors:
- The shift to low-carbon heating makes insulation essential — a poorly insulated house with a heat pump consumes needlessly
- "Full insulation + heat pump" projects represent the most dynamic market
Energy renovation is not a niche — it is the heart of the Belgian construction market for the next 20 years. Contractors who specialise now, who obtain the certifications and who master the grants have a considerable commercial lead over those who wait.